BERKS RIDGE COMPANY ENTERPRISES, INC

135 EAST HANCOCK STREET, LANSDALE, PA 19446
TEL. (215) 361-2600   FAX (215) 361-2897


SCOPE OF CONSTRUCTION MANAGEMENT


CONCEPTUAL PLANNING
Preliminary Master Schedule
Preconstruction Schedule
Conceptual Construction Estimate
Assist Owner with Project Budget
Aid Owner with Financing Studies
Project Organization Charts
Establish Reporting Procedures
Site Evaluation
65 - 70% of all potential project savings can occur at this stage
through efficient and well documented planning.


PRECONSTRUCTION
Update Master Schedule
    - Design Schedule
    - Preliminary Construction Schedule
Update Construction Estimate for Owner
    - Approval at each Design Stage
Value Engineering Reports
Constructability Review
Analysis of Alternate Schemes
Assist Owner with Approvals & Permits
Assist Owner Finalize Financing
Identify Long Lead Purchase Items
Determine General Conditions
Determine Bid List
Prepare Bid Packages
Analyze Bids
Establish GMP
20 - 25% of potential savings may be realized by effective
team work during the design and bid phase.


CONSTRUCTION
Update Master Schedule
    - Detailed Construction Schedule
    - Recovery Schedule
Progress Meeting Minutes
Purchase of Materials
Subcontract Administration
Quality Review
Shop Drawing Review
Change Order Controls
Progress Billing
Claims Management
Safety
Management & Field Reporting
Record Drawings
5 - 10% of potential savings may be realized during actual
construction through buyout & management


POST CONSTRUCTION
Final Cost Review
Contract Close-out
Move in & Start Up Activities
Record Drawings
Operation & Maintenance Manuals
Structure & Equipment Warranty Review


| Home | Mission Statement | Company Profile | Advantage of Construction Management |
| List of Projects | Photographs of Recent Projects |
| Tell Us About Your Project | Selected References | Contact Us |

Home | Contact The Help Desk | Internet & Marketing Services